Sam Holmes Sailingvídeo
Setting up the workshop
11 de febrero de 2021 · 11 min · 45K visitas
Qué cubre este vídeo
Sam Holmes outfits a new workshop by purchasing a $150 trailer and installing a hitch and light wiring kit on a Kia.0:09 He constructs a custom tailgate using salvaged wood and hinges, then uses the trailer to transport a heavy air compressor, which he maintains by adjusting the pressure switch to a 135-psi cutoff.2:34 The workshop setup includes installing a free chop saw and reframing a doorway in cinder block walls using lag shields.5:30 Plumbing work involves installing an eBay-sourced sink and a tankless hot water heater, with the initial PVC piping requiring multiple repairs before achieving a leak-free system.10:32 He replaces traditional cabinets with storage bins and removes an old furnace and wall to improve interior access.10:43 The project concludes with the sale and removal of an old tractor to clear workspace.6:54
Más de Sam Holmes Sailing
De Sam Holmes Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



