Sam Holmes Sailingvídeo
Setting up the workshop
11 de fevereiro de 2021 · 11 min · 45K visualizações
O que este vídeo aborda
Sam Holmes outfits a new workshop by purchasing a $150 trailer and installing a hitch and light wiring kit on a Kia.0:09 He constructs a custom tailgate using salvaged wood and hinges, then uses the trailer to transport a heavy air compressor, which he maintains by adjusting the pressure switch to a 135-psi cutoff.2:34 The workshop setup includes installing a free chop saw and reframing a doorway in cinder block walls using lag shields.5:30 Plumbing work involves installing an eBay-sourced sink and a tankless hot water heater, with the initial PVC piping requiring multiple repairs before achieving a leak-free system.10:32 He replaces traditional cabinets with storage bins and removes an old furnace and wall to improve interior access.10:43 The project concludes with the sale and removal of an old tractor to clear workspace.6:54
Mais de Sam Holmes Sailing
De Sam Holmes Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



