Sam Holmes Sailingvídeo

Setting up the workshop

11 de fevereiro de 2021 · 11 min · 45K visualizações

O que este vídeo aborda

Sam Holmes outfits a new workshop by purchasing a $150 trailer and installing a hitch and light wiring kit on a Kia.0:09 He constructs a custom tailgate using salvaged wood and hinges, then uses the trailer to transport a heavy air compressor, which he maintains by adjusting the pressure switch to a 135-psi cutoff.2:34 The workshop setup includes installing a free chop saw and reframing a doorway in cinder block walls using lag shields.5:30 Plumbing work involves installing an eBay-sourced sink and a tankless hot water heater, with the initial PVC piping requiring multiple repairs before achieving a leak-free system.10:32 He replaces traditional cabinets with storage bins and removes an old furnace and wall to improve interior access.10:43 The project concludes with the sale and removal of an old tractor to clear workspace.6:54

Ver no YouTube

Mais de Sam Holmes Sailing

We hit a log sailing by strange Indonesian sea platforms08/2026Replacing a window while sailing through pirate waters and wildlife of Borneo08/2026Sandakan and Wildlife of Borneo08/2026Kota Kinabalu Bound: Sailing, Survivor Island, Squalls, and Bugs, 3d printing07/2026

De Sam Holmes Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema