Sam Holmes Sailingvidéo

Setting up the workshop

11 février 2021 · 11 min · 45K vues

Ce que couvre cette vidéo

Sam Holmes outfits a new workshop by purchasing a $150 trailer and installing a hitch and light wiring kit on a Kia.0:09 He constructs a custom tailgate using salvaged wood and hinges, then uses the trailer to transport a heavy air compressor, which he maintains by adjusting the pressure switch to a 135-psi cutoff.2:34 The workshop setup includes installing a free chop saw and reframing a doorway in cinder block walls using lag shields.5:30 Plumbing work involves installing an eBay-sourced sink and a tankless hot water heater, with the initial PVC piping requiring multiple repairs before achieving a leak-free system.10:32 He replaces traditional cabinets with storage bins and removes an old furnace and wall to improve interior access.10:43 The project concludes with the sale and removal of an old tractor to clear workspace.6:54

Regarder sur YouTube

Plus de vidéos de Sam Holmes Sailing

Sailing to Maratua, a rarely visited Indonesian island sept. 2026We hit a log sailing by strange Indonesian sea platformsaoût 2026Replacing a window while sailing through pirate waters and wildlife of Borneoaoût 2026Sandakan and Wildlife of Borneoaoût 2026

De Sam Holmes Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème