Sven Yrvindvídeo
8 Aug 2025 Handholds & Laminations
7 de agosto de 2025 · 2 min · 1K visitas
Qué cubre este vídeo
Sven Yrvind installs a handhold on his boat, New Fudai, using a section of mast to ensure structural security.▶ 0:27 He integrates friction rings into the rigging system, which will connect to Dyneema lines running from the battens to the rings and cleats.▶ 1:06 The construction process involves laminating components with epoxy to increase strength and rigidity.▶ 1:32 Yrvind plans to simplify the layout on the remaining sides of the vessel as he progresses through the build.▶ 1:47 These modifications aim to improve the control and management of the sails and rigging components.▶ 1:47 The project relies on donated funds to procure necessary materials, including the epoxy and hardware.▶ 0:50
Más de Sven Yrvind
De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



