Sven Yrvindvidéo
8 Aug 2025 Handholds & Laminations
7 août 2025 · 2 min · 1K vues
Ce que couvre cette vidéo
Sven Yrvind installs a handhold on his boat, New Fudai, using a section of mast to ensure structural security.▶ 0:27 He integrates friction rings into the rigging system, which will connect to Dyneema lines running from the battens to the rings and cleats.▶ 1:06 The construction process involves laminating components with epoxy to increase strength and rigidity.▶ 1:32 Yrvind plans to simplify the layout on the remaining sides of the vessel as he progresses through the build.▶ 1:47 These modifications aim to improve the control and management of the sails and rigging components.▶ 1:47 The project relies on donated funds to procure necessary materials, including the epoxy and hardware.▶ 0:50
Plus de vidéos de Sven Yrvind
De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



