Sven Yrvindvídeo
8 Aug 2025 Handholds & Laminations
7 de agosto de 2025 · 2 min · 1K visualizações
O que este vídeo aborda
Sven Yrvind installs a handhold on his boat, New Fudai, using a section of mast to ensure structural security.▶ 0:27 He integrates friction rings into the rigging system, which will connect to Dyneema lines running from the battens to the rings and cleats.▶ 1:06 The construction process involves laminating components with epoxy to increase strength and rigidity.▶ 1:32 Yrvind plans to simplify the layout on the remaining sides of the vessel as he progresses through the build.▶ 1:47 These modifications aim to improve the control and management of the sails and rigging components.▶ 1:47 The project relies on donated funds to procure necessary materials, including the epoxy and hardware.▶ 0:50
Mais de Sven Yrvind
De Sven Yrvind — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



