Tips from a Shipwrightvídeo

Construyendo Orca - Episodio 14: Cuaderna de espejo

14 de junio de 2025 · 20 min · 35K visitas

Qué cubre este vídeo

Louis Sauzedde constructs the transom framework for a new build, Orca, using a lofting technique on a shop floor. To ensure stability during assembly, he blocks the loft floor off the concrete and uses plywood scraps and 2x4s as clamps to secure the timber pieces. He cuts corner knees for the transom using an Atlas Power King bandsaw, noting that the small blade allows for tighter curves than larger shop saws. Because the transom is designed with an angled planking run, he allows the knees to overhang the frame edges to ensure proper bearing, planning to dub the excess later.

Sauzedde lofts only one half of the transom, using the completed side as a template to build the second half. He uses polysulfide as a bedding compound between layers, preferring it over polyurethane for its slower cure time and easier cleanup. He drives vintage 1963 flat-head screws using a hand brace rather than an electric drill to maintain better control and alignment.

Ver en YouTube

Más de Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEmar 2026Progressive Bevelingfeb 20261958 Harley Davidson Panhead Motorcycle - For Salefeb 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Linesene 2026

De Tips from a Shipwright — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema