Tips from a Shipwrightvideo

Building Orca - Episode 14: Transom Frame

June 14, 2025 · 20 min · 35K views

What this video covers

Louis Sauzedde constructs the transom framework for a new build, Orca, using a lofting technique on a shop floor. To ensure stability during assembly, he blocks the loft floor off the concrete and uses plywood scraps and 2x4s as clamps to secure the timber pieces. He cuts corner knees for the transom using an Atlas Power King bandsaw, noting that the small blade allows for tighter curves than larger shop saws. Because the transom is designed with an angled planking run, he allows the knees to overhang the frame edges to ensure proper bearing, planning to dub the excess later.

Sauzedde lofts only one half of the transom, using the completed side as a template to build the second half. He uses polysulfide as a bedding compound between layers, preferring it over polyurethane for its slower cure time and easier cleanup. He drives vintage 1963 flat-head screws using a hand brace rather than an electric drill to maintain better control and alignment.

Watch on YouTube

More from Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEMar 2026Progressive BevelingFeb 20261958 Harley Davidson Panhead Motorcycle - For SaleFeb 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale LinesJan 2026

From Tips from a Shipwright — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue