Tips from a Shipwrightvídeo

Construir Orca - Episódio 14: Estrutura do painel de popa

14 de junho de 2025 · 20 min · 35K visualizações

O que este vídeo aborda

Louis Sauzedde constructs the transom framework for a new build, Orca, using a lofting technique on a shop floor. To ensure stability during assembly, he blocks the loft floor off the concrete and uses plywood scraps and 2x4s as clamps to secure the timber pieces. He cuts corner knees for the transom using an Atlas Power King bandsaw, noting that the small blade allows for tighter curves than larger shop saws. Because the transom is designed with an angled planking run, he allows the knees to overhang the frame edges to ensure proper bearing, planning to dub the excess later.

Sauzedde lofts only one half of the transom, using the completed side as a template to build the second half. He uses polysulfide as a bedding compound between layers, preferring it over polyurethane for its slower cure time and easier cleanup. He drives vintage 1963 flat-head screws using a hand brace rather than an electric drill to maintain better control and alignment.

Ver no YouTube

Mais de Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVE03/2026Progressive Beveling02/20261958 Harley Davidson Panhead Motorcycle - For Sale02/2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Lines01/2026

De Tips from a Shipwright — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema