Construyendo Orca - Episodio 14: Marco del espejo de popa
14 de junio de 2025 · 20 min · 35K vistas
¿Qué cubre este video?
Louis Sauzedde constructs the transom framework for a new build, Orca, using a lofting technique on a shop floor. To ensure stability during assembly, he blocks the loft floor off the concrete and uses plywood scraps and 2x4s as clamps to secure the timber pieces. He cuts corner knees for the transom using an Atlas Power King bandsaw, noting that the small blade allows for tighter curves than larger shop saws. Because the transom is designed with an angled planking run, he allows the knees to overhang the frame edges to ensure proper bearing, planning to dub the excess later.
Sauzedde lofts only one half of the transom, using the completed side as a template to build the second half. He uses polysulfide as a bedding compound between layers, preferring it over polyurethane for its slower cure time and easier cleanup. He drives vintage 1963 flat-head screws using a hand brace rather than an electric drill to maintain better control and alignment.
Más de Tips from a Shipwright
De Tips from a Shipwright — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



