Hold Fast!vídeo

S/V SeaSprite Refit - Quick Update

13 de mayo de 2023 · 1 min · 356 visitas

Qué cubre este vídeo

The port side deck of the S/V SeaSprite has undergone a core replacement, re-glassing, and fairing.0:12 The starboard side remains in progress, with the top skin marked for removal to address additional core damage.0:38 Near the head sail track, the bolt holes have been bored out and await filling with epoxy and subsequent fairing, though the underlying core in that specific section remains sound.0:46 The forward deck area has been filled, fared, and sanded, requiring only final cleaning to complete the surface preparation.0:59 These structural repairs focus on restoring deck integrity through systematic core replacement and epoxy work.

Ver en YouTube

Barcos en este vídeo

Cabo RICO 38Su barcoSea SPRITE 30Su barcoCabo RICO 56Su barco

Más de Hold Fast!

S/V SeaSprite Refit Update 4 Oct 2026oct 2026Hinckley Bermuda 40 MKIII Survey & Sea Trial oct 2026S/V SeaSprite Refit Update 18-20 Sep 2026sept 2026S/V SeaSprite Refit Update 9 September 2026sept 2026

De Hold Fast! — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema