Hold Fast!video

S/V SeaSprite Refit - Quick Update

13 de mayo de 2023 · 1 min · 356 vistas

¿Qué cubre este video?

The port side deck of the S/V SeaSprite has undergone a core replacement, re-glassing, and fairing.0:12 The starboard side remains in progress, with the top skin marked for removal to address additional core damage.0:38 Near the head sail track, the bolt holes have been bored out and await filling with epoxy and subsequent fairing, though the underlying core in that specific section remains sound.0:46 The forward deck area has been filled, fared, and sanded, requiring only final cleaning to complete the surface preparation.0:59 These structural repairs focus on restoring deck integrity through systematic core replacement and epoxy work.

Ver en YouTube

Barcos en este video

Cabo RICO 38Su barcoSea SPRITE 30Su barcoCabo RICO 56Su barco

Más de Hold Fast!

S/V SeaSprite Refit Update 4 Oct 2026oct 2026Hinckley Bermuda 40 MKIII Survey & Sea Trial oct 2026S/V SeaSprite Refit Update 18-20 Sep 2026sep 2026S/V SeaSprite Refit Update 9 September 2026sep 2026

De Hold Fast! — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema