Wake-Up Call: The Critical Failure That Could Have Been VERY BAD (25)
30 de junio de 2026 · 20 min · 37K visitas · Bahamas
Qué cubre este vídeo
A sailor replaces a failed headsail furler while anchored in the Bahamas after the unit seized due to 20 years of salt and corrosion.7:19 To remove the seized lower extrusion from the furler, the sailor uses a heat gun, a grinder with a cut-off wheel, and a hammer to break the bond.7:48 After cleaning the components with sandpaper, the sailor shrinks the metal by placing the part in a freezer for one hour, allowing for a successful reassembly.8:59 The installation requires loosening all standing rigging to create enough slack to slide the new unit onto the forestay.3:08 Once the furler is installed, the sailor re-tunes the rig under sail in 15 knots of wind, keeping the cotter pins out until the mast is properly tensioned and straight.18:51 The sailor also uses a 3D printer and ASA CF filament to fabricate a custom locking device for the furler assembly.4:57
Más de Expedition Engineering
De Expedition Engineering — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



