Salt & Tarvídeo

Salt & Tar: Ep.303- Framing Little Red

19 de septiembre de 2024 · 19 min · 37K visitas

Qué cubre este vídeo

Construction of a Chesapeake Lightcraft Tenderly dinghy proceeds using stitch-and-glue techniques, involving the installation of five internal frames into a hull formed from six of 14 total plywood planks.Watch The process requires securing planks with copper wire through pre-drilled holes before applying epoxy and fiberglass.0:55 During assembly, the builders encounter a design discrepancy where frames three and five lack the necessary reference holes for stitching, forcing them to manually align the components and drill new holes in place.6:36 To improve access for drilling and fitting, the hull is moved from a workbench to sawhorses.9:07 The builders adjust the mortise-and-tenon joints by trimming the frame nibs to accommodate slight alignment variations.16:01 This project marks a departure from the builder's typical heavy, traditional boat construction, favoring lightweight, modern materials for the dinghy intended for use with the vessel Red Aviva.12:09 The hull gains structural rigidity as frames are cinched into position, transitioning from flexible plywood sheets into a defined boat shape.11:24

Ver en YouTube

Más de Salt & Tar

Salt & Tar: Ep.360- Good Newsoct 2026Salt & Tar: Ep.359- Memory Lanesept 2026Salt & Tar: Ep.358- Sad Newssept 2026Salt & Tar: Ep.357- Finishing What We Startedsept 2026

De Salt & Tar — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema