Salt & Tarvideo
Salt & Tar: Ep.303- Framing Little Red
19 de septiembre de 2024 · 19 min · 37K vistas
¿Qué cubre este video?
Construction of a Chesapeake Lightcraft Tenderly dinghy proceeds using stitch-and-glue techniques, involving the installation of five internal frames into a hull formed from six of 14 total plywood planks.Watch The process requires securing planks with copper wire through pre-drilled holes before applying epoxy and fiberglass.0:55 During assembly, the builders encounter a design discrepancy where frames three and five lack the necessary reference holes for stitching, forcing them to manually align the components and drill new holes in place.6:36 To improve access for drilling and fitting, the hull is moved from a workbench to sawhorses.9:07 The builders adjust the mortise-and-tenon joints by trimming the frame nibs to accommodate slight alignment variations.16:01 This project marks a departure from the builder's typical heavy, traditional boat construction, favoring lightweight, modern materials for the dinghy intended for use with the vessel Red Aviva.12:09 The hull gains structural rigidity as frames are cinched into position, transitioning from flexible plywood sheets into a defined boat shape.11:24
Más de Salt & Tar
De Salt & Tar — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



