Salt & Tarvídeo

Salt & Tar: Ep.303- Framing Little Red

19 de setembro de 2024 · 19 min · 37K visualizações

O que este vídeo aborda

Construction of a Chesapeake Lightcraft Tenderly dinghy proceeds using stitch-and-glue techniques, involving the installation of five internal frames into a hull formed from six of 14 total plywood planks.Watch The process requires securing planks with copper wire through pre-drilled holes before applying epoxy and fiberglass.0:55 During assembly, the builders encounter a design discrepancy where frames three and five lack the necessary reference holes for stitching, forcing them to manually align the components and drill new holes in place.6:36 To improve access for drilling and fitting, the hull is moved from a workbench to sawhorses.9:07 The builders adjust the mortise-and-tenon joints by trimming the frame nibs to accommodate slight alignment variations.16:01 This project marks a departure from the builder's typical heavy, traditional boat construction, favoring lightweight, modern materials for the dinghy intended for use with the vessel Red Aviva.12:09 The hull gains structural rigidity as frames are cinched into position, transitioning from flexible plywood sheets into a defined boat shape.11:24

Ver no YouTube

Mais de Salt & Tar

Salt & Tar: Ep.360- Good News10/2026Salt & Tar: Ep.359- Memory Lane09/2026Salt & Tar: Ep.358- Sad News09/2026Salt & Tar: Ep.357- Finishing What We Started09/2026

De Salt & Tar — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema