Sailing Into the Mysticvídeo

S4, Ep37 It Rises! (Solar Arch Build, part 2)

10 de septiembre de 2025 · 21 min · 1K visitas · San Diego

Qué cubre este vídeo

Tim installs a custom stainless steel solar arch and integrated stern railing on *Into the Mystic* to replace existing safety lines and cables. To mount the arch, he drills holes through the tow rail and installs backing plates, using a "straw trick"—inserting straws into the holes and coating them with anti-seize—to precisely mark the plate alignment.4:53 After tack-welding the arch to the plates, he removes it to complete the welds, using water to protect the deck from sparks and a blanket to block wind during the process.9:33 He also removes the original stanchions, cleans out rotted wood, and fills the holes with thickened West Systems epoxy before re-drilling to ensure a secure mount for the new stainless tubing.8:12 The project includes repairing faulty wiring for the stern light and adding a new stanchion to support the modified railing configuration.16:42 The installation successfully integrates the arch with the stern and side railings, providing a rigid structure for future seating additions.19:57

Ver en YouTube

Más de Sailing Into the Mystic

Why We Ran North Before Hurricane Season Turned Scary [Ep 69]sept 2026Tim's Favorite Anchorage in All of Baja | Agua Verde [Ep68]sept 2026After Our Dinghy Was Stolen, We found Paradise! [Ep67]sept 2026We Left La Paz to Heal | Provisioning for Paradise [Ep66]sept 2026

De Sailing Into the Mystic — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema