S4, Ep37 It Rises! (Solar Arch Build, part 2)
10 settembre 2025 · 21 min · 964 visualizzazioni · San Diego
Cosa tratta questo video
Tim installs a custom stainless steel solar arch and integrated stern railing on *Into the Mystic* to replace existing safety lines and cables. To mount the arch, he drills holes through the tow rail and installs backing plates, using a "straw trick"—inserting straws into the holes and coating them with anti-seize—to precisely mark the plate alignment.▶ 4:53 After tack-welding the arch to the plates, he removes it to complete the welds, using water to protect the deck from sparks and a blanket to block wind during the process.▶ 9:33 He also removes the original stanchions, cleans out rotted wood, and fills the holes with thickened West Systems epoxy before re-drilling to ensure a secure mount for the new stainless tubing.▶ 8:12 The project includes repairing faulty wiring for the stern light and adding a new stanchion to support the modified railing configuration.▶ 16:42 The installation successfully integrates the arch with the stern and side railings, providing a rigid structure for future seating additions.▶ 19:57
Altro da Sailing Into the Mystic
Da Sailing Into the Mystic — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



