S4, Ep37 It Rises! (Solar Arch Build, part 2)
10 de septiembre de 2025 · 21 min · 964 vistas · San Diego
¿Qué cubre este video?
Tim installs a custom stainless steel solar arch and integrated stern railing on *Into the Mystic* to replace existing safety lines and cables. To mount the arch, he drills holes through the tow rail and installs backing plates, using a "straw trick"—inserting straws into the holes and coating them with anti-seize—to precisely mark the plate alignment.▶ 4:53 After tack-welding the arch to the plates, he removes it to complete the welds, using water to protect the deck from sparks and a blanket to block wind during the process.▶ 9:33 He also removes the original stanchions, cleans out rotted wood, and fills the holes with thickened West Systems epoxy before re-drilling to ensure a secure mount for the new stainless tubing.▶ 8:12 The project includes repairing faulty wiring for the stern light and adding a new stanchion to support the modified railing configuration.▶ 16:42 The installation successfully integrates the arch with the stern and side railings, providing a rigid structure for future seating additions.▶ 19:57
Más de Sailing Into the Mystic
De Sailing Into the Mystic — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



