MJ Sailingvídeo
CATAMARAN BUILD - How Many Guys Does It Take To Carry A Transom? (MJ Sailing - Ep 210)
14 de noviembre de 2021 · 22 min · 84K visitas · Kent Island
Qué cubre este vídeo
Matt and Jessica continue the construction of their 42-foot catamaran by reorganizing their workspace and installing a lower support beam on the bridge deck. To create more storage and movement space, the team removes temporary X-bracing supports from the bridge deck area.1:01 They use a methacrylate bonding agent to secure a new lower beam, ensuring it remains level with the bridge deck by using cleats and screws spaced approximately six inches apart.7:35 With the help of a crew of seven, they maneuver a 24-foot-wide transom piece into the construction tent, a task that required clearing stored foam panels and cabin top sections.17:30 The team also constructs wooden shelving racks to organize foam core materials previously scattered on the ground.13:07 These structural adjustments and the addition of the transom piece prepare the hull for further assembly before winter weather arrives.20:29
Más de MJ Sailing
De MJ Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



