MJ Sailingvideo

CATAMARAN BUILD - How Many Guys Does It Take To Carry A Transom? (MJ Sailing - Ep 210)

November 14, 2021 · 22 min · 84K views · Kent Island

What this video covers

Matt and Jessica continue the construction of their 42-foot catamaran by reorganizing their workspace and installing a lower support beam on the bridge deck. To create more storage and movement space, the team removes temporary X-bracing supports from the bridge deck area.1:01 They use a methacrylate bonding agent to secure a new lower beam, ensuring it remains level with the bridge deck by using cleats and screws spaced approximately six inches apart.7:35 With the help of a crew of seven, they maneuver a 24-foot-wide transom piece into the construction tent, a task that required clearing stored foam panels and cabin top sections.17:30 The team also constructs wooden shelving racks to organize foam core materials previously scattered on the ground.13:07 These structural adjustments and the addition of the transom piece prepare the hull for further assembly before winter weather arrives.20:29

Watch on YouTube

More from MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)Aug 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)Jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)Jun 2026Preparing Our Catamaran for Paint—and Me for Captain's SchoolJun 2026

From MJ Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue