MJ Sailingvidéo

CATAMARAN BUILD - How Many Guys Does It Take To Carry A Transom? (MJ Sailing - Ep 210)

14 novembre 2021 · 22 min · 84K vues · Kent Island

Ce que couvre cette vidéo

Matt and Jessica continue the construction of their 42-foot catamaran by reorganizing their workspace and installing a lower support beam on the bridge deck. To create more storage and movement space, the team removes temporary X-bracing supports from the bridge deck area.1:01 They use a methacrylate bonding agent to secure a new lower beam, ensuring it remains level with the bridge deck by using cleats and screws spaced approximately six inches apart.7:35 With the help of a crew of seven, they maneuver a 24-foot-wide transom piece into the construction tent, a task that required clearing stored foam panels and cabin top sections.17:30 The team also constructs wooden shelving racks to organize foam core materials previously scattered on the ground.13:07 These structural adjustments and the addition of the transom piece prepare the hull for further assembly before winter weather arrives.20:29

Regarder sur YouTube

Plus de vidéos de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)août 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juil. 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juin 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljuin 2026

De MJ Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème