MJ Sailingvideo
CATAMARAN BUILD - How Many Guys Does It Take To Carry A Transom? (MJ Sailing - Ep 210)
14 de noviembre de 2021 · 22 min · 84K vistas · Kent Island
¿Qué cubre este video?
Matt and Jessica continue the construction of their 42-foot catamaran by reorganizing their workspace and installing a lower support beam on the bridge deck. To create more storage and movement space, the team removes temporary X-bracing supports from the bridge deck area.1:01 They use a methacrylate bonding agent to secure a new lower beam, ensuring it remains level with the bridge deck by using cleats and screws spaced approximately six inches apart.7:35 With the help of a crew of seven, they maneuver a 24-foot-wide transom piece into the construction tent, a task that required clearing stored foam panels and cabin top sections.17:30 The team also constructs wooden shelving racks to organize foam core materials previously scattered on the ground.13:07 These structural adjustments and the addition of the transom piece prepare the hull for further assembly before winter weather arrives.20:29
Más de MJ Sailing
De MJ Sailing — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



