VOILIER ODINvídeo

THE FLOOR: INTERIOR FINISHED

9 de junio de 2024 · 32 min · 8K visitas

Qué cubre este vídeo

The owner of a sailboat undergoing a multi-year refit installs vinyl flooring throughout the interior to replace painted surfaces. To ensure a flush finish, the flooring is applied directly over the existing floorboards without recessing, utilizing the material's thickness to achieve a level surface. The process involves using vinyl adhesive, allowing 25 minutes for the glue to set, and trimming the edges with a utility knife after the material is fully bonded. The owner notes that the vinyl provides better traction than the previous varnished wood, which was slippery when wet. Additionally, the project includes installing a 100-micron stainless steel mesh filter on the fuel line to act as a pre-filter before the primary water separator and engine fuel filter. This filter is easily cleaned with a brush and solvent. The interior refit concludes with the installation of cushions, completing a two-and-a-half-year renovation project in preparation for a hull thickness survey and upcoming sea trials.

Ver en YouTube

Barcos en este vídeo

Etap 38iSu barco

Más de VOILIER ODIN

Sailing under asymmetric spinnaker with a Sun Odysseyago 2026TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATIONago 2026WHY I'M MOVING BACK TO FRANCEjul 2026THIS IS ALSO WHAT BOAT LIFE IS LIKEjun 2026

De VOILIER ODIN — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema