VOILIER ODINvidéo

THE FLOOR: INTERIOR FINISHED

9 juin 2024 · 32 min · 8K vues

Ce que couvre cette vidéo

The owner of a sailboat undergoing a multi-year refit installs vinyl flooring throughout the interior to replace painted surfaces. To ensure a flush finish, the flooring is applied directly over the existing floorboards without recessing, utilizing the material's thickness to achieve a level surface. The process involves using vinyl adhesive, allowing 25 minutes for the glue to set, and trimming the edges with a utility knife after the material is fully bonded. The owner notes that the vinyl provides better traction than the previous varnished wood, which was slippery when wet. Additionally, the project includes installing a 100-micron stainless steel mesh filter on the fuel line to act as a pre-filter before the primary water separator and engine fuel filter. This filter is easily cleaned with a brush and solvent. The interior refit concludes with the installation of cushions, completing a two-and-a-half-year renovation project in preparation for a hull thickness survey and upcoming sea trials.

Regarder sur YouTube

Bateaux dans cette vidéo

Etap 38iLeur bateau

Plus de vidéos de VOILIER ODIN

Sailing under asymmetric spinnaker with a Sun Odysseyaoût 2026TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATIONaoût 2026WHY I'M MOVING BACK TO FRANCEjuil. 2026THIS IS ALSO WHAT BOAT LIFE IS LIKEjuin 2026

De VOILIER ODIN — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème