VOILIER ODINvídeo

THE FLOOR: INTERIOR FINISHED

9 de junho de 2024 · 32 min · 8K visualizações

O que este vídeo aborda

The owner of a sailboat undergoing a multi-year refit installs vinyl flooring throughout the interior to replace painted surfaces. To ensure a flush finish, the flooring is applied directly over the existing floorboards without recessing, utilizing the material's thickness to achieve a level surface. The process involves using vinyl adhesive, allowing 25 minutes for the glue to set, and trimming the edges with a utility knife after the material is fully bonded. The owner notes that the vinyl provides better traction than the previous varnished wood, which was slippery when wet. Additionally, the project includes installing a 100-micron stainless steel mesh filter on the fuel line to act as a pre-filter before the primary water separator and engine fuel filter. This filter is easily cleaned with a brush and solvent. The interior refit concludes with the installation of cushions, completing a two-and-a-half-year renovation project in preparation for a hull thickness survey and upcoming sea trials.

Assistir no YouTube

Barcos neste vídeo

Etap 38iO barco deles

Mais de VOILIER ODIN

Sailing under asymmetric spinnaker with a Sun Odysseyago. de 2026TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATIONago. de 2026WHY I'M MOVING BACK TO FRANCEjul. de 2026THIS IS ALSO WHAT BOAT LIFE IS LIKEjun. de 2026

De VOILIER ODIN — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema