Salt & Tarvídeo
Salt & Tar: Ep.117- A Jack Tar's View
10 de diciembre de 2020 · 23 min · 62K visitas · California
Qué cubre este vídeo
After five years of construction, the owners of a custom-built boat are finalizing the standing rigging and deck hardware while the vessel is in the water. The project involves seizing the forward port shroud using two frapping turns, a process chosen as a preliminary measure to accommodate hand fatigue.3:56 To protect the mast base, the crew constructs a custom mizzen mast boot using Sikaflex, self-amalgamating rigging tape, and a protective coating of net dip.8:47 The installation of upper whisker chain plates requires custom-cut backing blocks made from leftover bulwark planking, which are bedded with butyl tape on the exterior and Sikaflex on the interior.9:28 The crew also replaces engine hoses and cleans the marine diesel motor.1:28 Finally, the team hoists the forestay to the masthead, using a messenger line and a thimble crimped with a press.15:36 The process includes applying a protective slush coating to the wire and hardware to prevent corrosion.17:14
Más de Salt & Tar
De Salt & Tar — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



