Salt & Tarvídeo

Salt & Tar: Ep.117- A Jack Tar's View

10 de diciembre de 2020 · 23 min · 62K visitas · California

Qué cubre este vídeo

After five years of construction, the owners of a custom-built boat are finalizing the standing rigging and deck hardware while the vessel is in the water. The project involves seizing the forward port shroud using two frapping turns, a process chosen as a preliminary measure to accommodate hand fatigue.3:56 To protect the mast base, the crew constructs a custom mizzen mast boot using Sikaflex, self-amalgamating rigging tape, and a protective coating of net dip.8:47 The installation of upper whisker chain plates requires custom-cut backing blocks made from leftover bulwark planking, which are bedded with butyl tape on the exterior and Sikaflex on the interior.9:28 The crew also replaces engine hoses and cleans the marine diesel motor.1:28 Finally, the team hoists the forestay to the masthead, using a messenger line and a thimble crimped with a press.15:36 The process includes applying a protective slush coating to the wire and hardware to prevent corrosion.17:14

Ver en YouTube

Más de Salt & Tar

Salt & Tar: Ep.357- Finishing What We Startedsept 2026Salt & Tar: Ep.356- Dock Lifeago 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harborago 2026Salt & Tar: Ep.354- Enjoying the Sensation of Floatingago 2026

De Salt & Tar — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema