Salt & Tarvidéo
Salt & Tar: Ep.117- A Jack Tar's View
10 décembre 2020 · 23 min · 62K vues · California
Ce que couvre cette vidéo
After five years of construction, the owners of a custom-built boat are finalizing the standing rigging and deck hardware while the vessel is in the water. The project involves seizing the forward port shroud using two frapping turns, a process chosen as a preliminary measure to accommodate hand fatigue.3:56 To protect the mast base, the crew constructs a custom mizzen mast boot using Sikaflex, self-amalgamating rigging tape, and a protective coating of net dip.8:47 The installation of upper whisker chain plates requires custom-cut backing blocks made from leftover bulwark planking, which are bedded with butyl tape on the exterior and Sikaflex on the interior.9:28 The crew also replaces engine hoses and cleans the marine diesel motor.1:28 Finally, the team hoists the forestay to the masthead, using a messenger line and a thimble crimped with a press.15:36 The process includes applying a protective slush coating to the wire and hardware to prevent corrosion.17:14
Plus de vidéos de Salt & Tar
De Salt & Tar — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



