Salt & Tarvideo

Salt & Tar: Ep.117- A Jack Tar's View

10 December 2020 · 23 min · 62K views · California

What this video covers

After five years of construction, the owners of a custom-built boat are finalizing the standing rigging and deck hardware while the vessel is in the water. The project involves seizing the forward port shroud using two frapping turns, a process chosen as a preliminary measure to accommodate hand fatigue.3:56 To protect the mast base, the crew constructs a custom mizzen mast boot using Sikaflex, self-amalgamating rigging tape, and a protective coating of net dip.8:47 The installation of upper whisker chain plates requires custom-cut backing blocks made from leftover bulwark planking, which are bedded with butyl tape on the exterior and Sikaflex on the interior.9:28 The crew also replaces engine hoses and cleans the marine diesel motor.1:28 Finally, the team hoists the forestay to the masthead, using a messenger line and a thimble crimped with a press.15:36 The process includes applying a protective slush coating to the wire and hardware to prevent corrosion.17:14

Watch on YouTube

More from Salt & Tar

Salt & Tar: Ep.361- IN-THE-WATER SurveyOct 2026Meet Victoria - Tour of our William Garden 'Porpoise' built by Robin Fung in 1975Oct 2026Salt & Tar: Ep.360- Good NewsOct 2026Salt & Tar: Ep.359- Memory LaneSept 2026

From Salt & Tar — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue