Salt & Tarvídeo

Salt & Tar: Ep.117- A Jack Tar's View

10 de dezembro de 2020 · 23 min · 62K visualizações · California

O que este vídeo aborda

After five years of construction, the owners of a custom-built boat are finalizing the standing rigging and deck hardware while the vessel is in the water. The project involves seizing the forward port shroud using two frapping turns, a process chosen as a preliminary measure to accommodate hand fatigue.3:56 To protect the mast base, the crew constructs a custom mizzen mast boot using Sikaflex, self-amalgamating rigging tape, and a protective coating of net dip.8:47 The installation of upper whisker chain plates requires custom-cut backing blocks made from leftover bulwark planking, which are bedded with butyl tape on the exterior and Sikaflex on the interior.9:28 The crew also replaces engine hoses and cleans the marine diesel motor.1:28 Finally, the team hoists the forestay to the masthead, using a messenger line and a thimble crimped with a press.15:36 The process includes applying a protective slush coating to the wire and hardware to prevent corrosion.17:14

Assistir no YouTube

Mais de Salt & Tar

Salt & Tar: Ep.357- Finishing What We Startedset. de 2026Salt & Tar: Ep.356- Dock Lifeago. de 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harborago. de 2026Salt & Tar: Ep.354- Enjoying the Sensation of Floatingago. de 2026

De Salt & Tar — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema