Acorn To Arabellavídeo

Getting Ready to Live Aboard a Sailboat During Winter in Newfoundland

17 de octubre de 2025 · 21 min · 30K visitas · Newfoundland

Qué cubre este vídeo

Preparing *Arabella* for a Newfoundland winter involves insulating hatches, winterizing the water maker, and modifying the freshwater fill system. To combat condensation, Steve installs exterior window film on port lights and removes insect screens to prevent moisture buildup.2:18 He replaces the standard, laborious tank-filling process by installing quick-connect fittings on the boat’s water intake ports, allowing for a direct hose connection from shore.6:23 The water maker is pickled for the season by flushing the system with fresh water and circulating a storage solution through the brine discharge and service ports.11:04 Additionally, Steve repairs a leaking diesel heater by disassembling and cleaning the metering valve assembly, which had been allowing fuel to escape through the overflow valve.15:04 The crew plans to shrink-wrap the deck in the coming weeks to further improve thermal efficiency for the winter months.4:42

Ver en YouTube

Más de Acorn To Arabella

Upgrading the Rudder and Another Trek To The Cliffago 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjul 2026Exploring Newfoundland's Unclimbed Coastal Cliffs by Sailboatjul 2026Fjord Hopping | Arabella Sails East Toward The Nuddickjul 2026

De Acorn To Arabella — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema