Acorn To Arabellavideo

Getting Ready to Live Aboard a Sailboat During Winter in Newfoundland

17 October 2025 · 21 min · 30K views · Newfoundland

What this video covers

Preparing *Arabella* for a Newfoundland winter involves insulating hatches, winterizing the water maker, and modifying the freshwater fill system. To combat condensation, Steve installs exterior window film on port lights and removes insect screens to prevent moisture buildup.2:18 He replaces the standard, laborious tank-filling process by installing quick-connect fittings on the boat’s water intake ports, allowing for a direct hose connection from shore.6:23 The water maker is pickled for the season by flushing the system with fresh water and circulating a storage solution through the brine discharge and service ports.11:04 Additionally, Steve repairs a leaking diesel heater by disassembling and cleaning the metering valve assembly, which had been allowing fuel to escape through the overflow valve.15:04 The crew plans to shrink-wrap the deck in the coming weeks to further improve thermal efficiency for the winter months.4:42

Watch on YouTube

More from Acorn To Arabella

Saying Goodbye to Newfoundland—and the Man Who Inspired ArabellaSept 2026Upgrading the Rudder and Another Trek To The CliffAug 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastJul 2026Exploring Newfoundland's Unclimbed Coastal Cliffs by SailboatJul 2026

From Acorn To Arabella — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue