Acorn To Arabellavídeo

Getting Ready to Live Aboard a Sailboat During Winter in Newfoundland

17 de outubro de 2025 · 21 min · 30K visualizações · Newfoundland

O que este vídeo aborda

Preparing *Arabella* for a Newfoundland winter involves insulating hatches, winterizing the water maker, and modifying the freshwater fill system. To combat condensation, Steve installs exterior window film on port lights and removes insect screens to prevent moisture buildup.2:18 He replaces the standard, laborious tank-filling process by installing quick-connect fittings on the boat’s water intake ports, allowing for a direct hose connection from shore.6:23 The water maker is pickled for the season by flushing the system with fresh water and circulating a storage solution through the brine discharge and service ports.11:04 Additionally, Steve repairs a leaking diesel heater by disassembling and cleaning the metering valve assembly, which had been allowing fuel to escape through the overflow valve.15:04 The crew plans to shrink-wrap the deck in the coming weeks to further improve thermal efficiency for the winter months.4:42

Ver no YouTube

Mais de Acorn To Arabella

Upgrading the Rudder and Another Trek To The Cliff08/2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coast07/2026Exploring Newfoundland's Unclimbed Coastal Cliffs by Sailboat07/2026Fjord Hopping | Arabella Sails East Toward The Nuddick07/2026

De Acorn To Arabella — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema