Acorn To Arabellavidéo

Getting Ready to Live Aboard a Sailboat During Winter in Newfoundland

17 octobre 2025 · 21 min · 30K vues · Newfoundland

Ce que couvre cette vidéo

Preparing *Arabella* for a Newfoundland winter involves insulating hatches, winterizing the water maker, and modifying the freshwater fill system. To combat condensation, Steve installs exterior window film on port lights and removes insect screens to prevent moisture buildup.2:18 He replaces the standard, laborious tank-filling process by installing quick-connect fittings on the boat’s water intake ports, allowing for a direct hose connection from shore.6:23 The water maker is pickled for the season by flushing the system with fresh water and circulating a storage solution through the brine discharge and service ports.11:04 Additionally, Steve repairs a leaking diesel heater by disassembling and cleaning the metering valve assembly, which had been allowing fuel to escape through the overflow valve.15:04 The crew plans to shrink-wrap the deck in the coming weeks to further improve thermal efficiency for the winter months.4:42

Regarder sur YouTube

Plus de vidéos de Acorn To Arabella

Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellasept. 2026Upgrading the Rudder and Another Trek To The Cliffaoût 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjuil. 2026Exploring Newfoundland's Unclimbed Coastal Cliffs by Sailboatjuil. 2026

De Acorn To Arabella — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème