Salt & Tarvídeo

Salt & Tar: Ep.340- Fixation

7 de mayo de 2026 · 21 min · 54K visitas

Qué cubre este vídeo

Garrett and Ruth laminate a two-layer, 1/2-inch thick pilot house roof for their George Buehler sailboat.3:26 They construct the roof using two layers of 1/4-inch plywood, bonding them with Total Boat epoxy resin.2:59 To maintain the roof's natural crown without deforming the shape with excessive weight, they use a combination of clamps and screws to secure the layers during the cure.1:28 Because the work occurs during a 93-degree heat wave, they maintain a rapid pace to stay within the epoxy's working time.0:46 After the initial lamination, they refine the roof's aesthetic profile by using a long batten to mark the visor curve and routing the bottom edges before final installation.15:19 The project includes plans for future solar panel mounting and rain catchment.10:49 The team emphasizes the importance of avoiding over-analysis during the refit process to maintain progress on the vessel's transformation.

Ver en YouTube

Más de Salt & Tar

Salt & Tar: Ep.361- IN-THE-WATER Surveyoct 2026Meet Victoria - Tour of our William Garden 'Porpoise' built by Robin Fung in 1975oct 2026Salt & Tar: Ep.360- Good Newsoct 2026Salt & Tar: Ep.359- Memory Lanesept 2026

De Salt & Tar — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema