Salt & Tarvidéo
Salt & Tar: Ep.340- Fixation
7 mai 2026 · 21 min · 54K vues
Ce que couvre cette vidéo
Garrett and Ruth laminate a two-layer, 1/2-inch thick pilot house roof for their George Buehler sailboat.3:26 They construct the roof using two layers of 1/4-inch plywood, bonding them with Total Boat epoxy resin.2:59 To maintain the roof's natural crown without deforming the shape with excessive weight, they use a combination of clamps and screws to secure the layers during the cure.1:28 Because the work occurs during a 93-degree heat wave, they maintain a rapid pace to stay within the epoxy's working time.0:46 After the initial lamination, they refine the roof's aesthetic profile by using a long batten to mark the visor curve and routing the bottom edges before final installation.15:19 The project includes plans for future solar panel mounting and rain catchment.10:49 The team emphasizes the importance of avoiding over-analysis during the refit process to maintain progress on the vessel's transformation.
Plus de vidéos de Salt & Tar
De Salt & Tar — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



