Salt & Tarvideo

Salt & Tar: Ep.340- Fixation

May 7, 2026 · 21 min · 54K views

What this video covers

Garrett and Ruth laminate a two-layer, 1/2-inch thick pilot house roof for their George Buehler sailboat.3:26 They construct the roof using two layers of 1/4-inch plywood, bonding them with Total Boat epoxy resin.2:59 To maintain the roof's natural crown without deforming the shape with excessive weight, they use a combination of clamps and screws to secure the layers during the cure.1:28 Because the work occurs during a 93-degree heat wave, they maintain a rapid pace to stay within the epoxy's working time.0:46 After the initial lamination, they refine the roof's aesthetic profile by using a long batten to mark the visor curve and routing the bottom edges before final installation.15:19 The project includes plans for future solar panel mounting and rain catchment.10:49 The team emphasizes the importance of avoiding over-analysis during the refit process to maintain progress on the vessel's transformation.

Watch on YouTube

More from Salt & Tar

Salt & Tar: Ep.357- Finishing What We StartedSep 2026Salt & Tar: Ep.356- Dock LifeAug 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling HarborAug 2026Salt & Tar: Ep.354- Enjoying the Sensation of FloatingAug 2026

From Salt & Tar — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue