Hold Fast!vídeo
S/V SeaSprite Refit Update
24 de junio de 2023 · 1 min · 467 visitas
Qué cubre este vídeo
Refit work on the S/V SeaSprite focuses on the starboard side decks, specifically addressing structural integrity around the chain plates and winch platforms.Watch The project involves clearing debris and dust from the deck surface to prepare for filling existing holes.0:42 The deck in the area surrounding the chain plates remains dry, confirming the structural soundness of the core despite the surface damage.0:50 The repair process mirrors the work previously completed on the port side, involving the removal of old hardware and the preparation of mounting surfaces.0:30 The ongoing restoration requires systematic attention to each deck section to ensure proper sealing and reinforcement.
Barcos en este vídeo
Más de Hold Fast!
De Hold Fast! — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



