Hold Fast!vídeo

S/V SeaSprite Refit Update

24 de junio de 2023 · 1 min · 467 visitas

Qué cubre este vídeo

Refit work on the S/V SeaSprite focuses on the starboard side decks, specifically addressing structural integrity around the chain plates and winch platforms.Watch The project involves clearing debris and dust from the deck surface to prepare for filling existing holes.0:42 The deck in the area surrounding the chain plates remains dry, confirming the structural soundness of the core despite the surface damage.0:50 The repair process mirrors the work previously completed on the port side, involving the removal of old hardware and the preparation of mounting surfaces.0:30 The ongoing restoration requires systematic attention to each deck section to ensure proper sealing and reinforcement.

Ver en YouTube

Barcos en este vídeo

Sea SPRITE 30Su barcoCabo RICO 38Su barcoCabo RICO 56Su barco

Más de Hold Fast!

S/V SeaSprite Refit Update 4 Oct 2026oct 2026Hinckley Bermuda 40 MKIII Survey & Sea Trial oct 2026S/V SeaSprite Refit Update 18-20 Sep 2026sept 2026S/V SeaSprite Refit Update 9 September 2026sept 2026

De Hold Fast! — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema