Hold Fast!vídeo

S/V SeaSprite Refit Update

24 de junho de 2023 · 1 min · 467 visualizações

O que este vídeo aborda

Refit work on the S/V SeaSprite focuses on the starboard side decks, specifically addressing structural integrity around the chain plates and winch platforms.Watch The project involves clearing debris and dust from the deck surface to prepare for filling existing holes.0:42 The deck in the area surrounding the chain plates remains dry, confirming the structural soundness of the core despite the surface damage.0:50 The repair process mirrors the work previously completed on the port side, involving the removal of old hardware and the preparation of mounting surfaces.0:30 The ongoing restoration requires systematic attention to each deck section to ensure proper sealing and reinforcement.

Assistir no YouTube

Barcos neste vídeo

Sea SPRITE 30O barco delesCabo RICO 38O barco delesCabo RICO 56O barco deles

Mais de Hold Fast!

S/V SeaSprite Refit Update 4 Oct 2026out. de 2026Hinckley Bermuda 40 MKIII Survey & Sea Trial out. de 2026S/V SeaSprite Refit Update 18-20 Sep 2026set. de 2026S/V SeaSprite Refit Update 9 September 2026set. de 2026

De Hold Fast! — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema