Hold Fast!video

S/V SeaSprite Refit Update 4 Oct 2026

4 de octubre de 2026 · 7 min · 4K vistas · Phipps Boatworks

¿Qué cubre este video?

The S/V SeaSprite refit at Phipps Boatworks focuses on exterior varnish preparation and interior structural modifications. The toe rails and eyebrows are sanded to 220 grit, with varnish application scheduled to precede deck painting to prevent surface damage.0:14 Mast repairs are complete, with several unnecessary holes welded shut to prepare the spar for painting.0:53 Interior work involves removing all locker doors, hatch covers, and trim for off-site varnishing, while the boat’s interior surfaces receive a combination of satin and high-gloss finishes.2:13 The crew plans to install closed-cell foam insulation behind the V-berth ceiling boards and paint the supporting wood white to improve visibility for maintenance.5:54 Additionally, the salon hatch requires enlargement to provide full access to both compartments of the water tank for cleaning.6:56 The project remains in a state of cumulative progress, with the current phase prioritizing finish work and structural accessibility.

Ver en YouTube

Barcos en este video

Sea SPRITE 30Su barcoCabo RICO 38Su barcoCabo RICO 56Su barco

Más de Hold Fast!

Hinckley Bermuda 40 MKIII Survey & Sea Trial oct 2026S/V SeaSprite Refit Update 18-20 Sep 2026sep 2026S/V SeaSprite Refit Update 9 September 2026sep 2026S/V SeaSprite Refit Update 8 September 2026sep 2026

De Hold Fast! — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema