Hold Fast!vidéo
S/V SeaSprite Refit Update 4 Oct 2026
4 octobre 2026 · 7 min · 4K vues · Phipps Boatworks
Ce que couvre cette vidéo
The S/V SeaSprite refit at Phipps Boatworks focuses on exterior varnish preparation and interior structural modifications. The toe rails and eyebrows are sanded to 220 grit, with varnish application scheduled to precede deck painting to prevent surface damage.0:14 Mast repairs are complete, with several unnecessary holes welded shut to prepare the spar for painting.0:53 Interior work involves removing all locker doors, hatch covers, and trim for off-site varnishing, while the boat’s interior surfaces receive a combination of satin and high-gloss finishes.2:13 The crew plans to install closed-cell foam insulation behind the V-berth ceiling boards and paint the supporting wood white to improve visibility for maintenance.5:54 Additionally, the salon hatch requires enlargement to provide full access to both compartments of the water tank for cleaning.6:56 The project remains in a state of cumulative progress, with the current phase prioritizing finish work and structural accessibility.
Bateaux dans cette vidéo
Plus de vidéos de Hold Fast!
De Hold Fast! — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



