Hold Fast!vidéo

S/V SeaSprite Refit Update 4 Oct 2026

4 octobre 2026 · 7 min · 4K vues · Phipps Boatworks

Ce que couvre cette vidéo

The S/V SeaSprite refit at Phipps Boatworks focuses on exterior varnish preparation and interior structural modifications. The toe rails and eyebrows are sanded to 220 grit, with varnish application scheduled to precede deck painting to prevent surface damage.0:14 Mast repairs are complete, with several unnecessary holes welded shut to prepare the spar for painting.0:53 Interior work involves removing all locker doors, hatch covers, and trim for off-site varnishing, while the boat’s interior surfaces receive a combination of satin and high-gloss finishes.2:13 The crew plans to install closed-cell foam insulation behind the V-berth ceiling boards and paint the supporting wood white to improve visibility for maintenance.5:54 Additionally, the salon hatch requires enlargement to provide full access to both compartments of the water tank for cleaning.6:56 The project remains in a state of cumulative progress, with the current phase prioritizing finish work and structural accessibility.

Regarder sur YouTube

Bateaux dans cette vidéo

Sea SPRITE 30Leur bateauCabo RICO 38Leur bateauCabo RICO 56Leur bateau

Plus de vidéos de Hold Fast!

Hinckley Bermuda 40 MKIII Survey & Sea Trial oct. 2026S/V SeaSprite Refit Update 18-20 Sep 2026sept. 2026S/V SeaSprite Refit Update 9 September 2026sept. 2026S/V SeaSprite Refit Update 8 September 2026sept. 2026

De Hold Fast! — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème