Entre Terras e Maresvideo

The Pilot House is almost ready for the Formica. Ep142

3 de noviembre de 2024 · 13 min · 398 vistas

¿Qué cubre este video?

Edgar and Sâmia continue the interior fit-out of the Pilot House, focusing on cabinetry and structural preparations for applying Fórmica laminate. The crew constructs a storage cabinet for essential supplies and a dedicated locker for wet gear.5:26 To accommodate the gas heater exhaust, Edgar drills a hole through the existing wooden structure using a drill bit, a multi-tool, and a grinding wheel after a hole saw proved too large for the confined space.7:41 He plans to install a one-way valve to prevent water ingress at the exhaust point.6:12 The team also frames the interior of the Pilot House to house the engine panel and VHF radio, positioning them for access from both the forward and aft steering stations.11:18 While testing PET laminate for the final finish, the crew decides to abandon the material in favor of Fórmica.0:49 Structural components are prepared for epoxy bonding and lamination, with final adjustments pending for door fitment and painting.10:41

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema