Entre Terras e Maresvidéo

The Pilot House is almost ready for the Formica. Ep142

3 novembre 2024 · 13 min · 398 vues

Ce que couvre cette vidéo

Edgar and Sâmia continue the interior fit-out of the Pilot House, focusing on cabinetry and structural preparations for applying Fórmica laminate. The crew constructs a storage cabinet for essential supplies and a dedicated locker for wet gear.5:26 To accommodate the gas heater exhaust, Edgar drills a hole through the existing wooden structure using a drill bit, a multi-tool, and a grinding wheel after a hole saw proved too large for the confined space.7:41 He plans to install a one-way valve to prevent water ingress at the exhaust point.6:12 The team also frames the interior of the Pilot House to house the engine panel and VHF radio, positioning them for access from both the forward and aft steering stations.11:18 While testing PET laminate for the final finish, the crew decides to abandon the material in favor of Fórmica.0:49 Structural components are prepared for epoxy bonding and lamination, with final adjustments pending for door fitment and painting.10:41

Regarder sur YouTube

Plus de vidéos de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183juil. 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182juin 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181juin 2026This week the focus was on something elsejuin 2026

De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème