Entre Terras e Maresvideo
The Pilot House is almost ready for the Formica. Ep142
3 November 2024 · 13 min · 398 views
What this video covers
Edgar and Sâmia continue the interior fit-out of the Pilot House, focusing on cabinetry and structural preparations for applying Fórmica laminate. The crew constructs a storage cabinet for essential supplies and a dedicated locker for wet gear.5:26 To accommodate the gas heater exhaust, Edgar drills a hole through the existing wooden structure using a drill bit, a multi-tool, and a grinding wheel after a hole saw proved too large for the confined space.7:41 He plans to install a one-way valve to prevent water ingress at the exhaust point.6:12 The team also frames the interior of the Pilot House to house the engine panel and VHF radio, positioning them for access from both the forward and aft steering stations.11:18 While testing PET laminate for the final finish, the crew decides to abandon the material in favor of Fórmica.0:49 Structural components are prepared for epoxy bonding and lamination, with final adjustments pending for door fitment and painting.10:41
More from Entre Terras e Mares
From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



