Broken sail, time to go up the mast
27 de agosto de 2017 · 2 min · 8K vistas
¿Qué cubre este video?
Paula and her crew identify a tear in the mainsail while underway.Watch To inspect and repair the damage, the crew prepares for a mast climb.Watch Paula coordinates the operation, instructing the crew to manage the halyard and tension lines to ensure stability while the climber ascends. The team uses a synchronized count to coordinate the release and tensioning of the lines, allowing the climber to reach the damaged section of the sail.0:42 The procedure requires precise communication between the person on the mast and those handling the lines on deck to maintain safety and control during the ascent.
Más de Allende los Mares · Vuelta Vertical
De Allende los Mares · Vuelta Vertical — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



