Allende los Mares · Vuelta Verticalvídeo

Broken sail, time to go up the mast

27 de agosto de 2017 · 2 min · 8K visualizações

O que este vídeo aborda

Paula and her crew identify a tear in the mainsail while underway.Watch To inspect and repair the damage, the crew prepares for a mast climb.Watch Paula coordinates the operation, instructing the crew to manage the halyard and tension lines to ensure stability while the climber ascends. The team uses a synchronized count to coordinate the release and tensioning of the lines, allowing the climber to reach the damaged section of the sail.0:42 The procedure requires precise communication between the person on the mast and those handling the lines on deck to maintain safety and control during the ascent.

Assistir no YouTube

Mais de Allende los Mares · Vuelta Vertical

Vertical World Tour - Northwest Passageago. de 2026Arctic ⛵️🌏 Northwest Passageago. de 2026Sailing around the world 🌎⛵️VERTICALjul. de 2026How to configure your sailboat chartplotter | Charts, radar, AIS, and B&G Zeus SR12 instrumentsjun. de 2026

De Allende los Mares · Vuelta Vertical — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema