Broken sail, time to go up the mast
27 agosto 2017 · 2 min · 8K visualizzazioni
Cosa tratta questo video
Paula and her crew identify a tear in the mainsail while underway.Watch To inspect and repair the damage, the crew prepares for a mast climb.Watch Paula coordinates the operation, instructing the crew to manage the halyard and tension lines to ensure stability while the climber ascends. The team uses a synchronized count to coordinate the release and tensioning of the lines, allowing the climber to reach the damaged section of the sail.0:42 The procedure requires precise communication between the person on the mast and those handling the lines on deck to maintain safety and control during the ascent.
Altro da Allende los Mares · Vuelta Vertical
Da Allende los Mares · Vuelta Vertical — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



