Broken sail, time to go up the mast
27 de agosto de 2017 · 2 min · 8K visualizações
O que este vídeo aborda
Paula and her crew identify a tear in the mainsail while underway.Watch To inspect and repair the damage, the crew prepares for a mast climb.Watch Paula coordinates the operation, instructing the crew to manage the halyard and tension lines to ensure stability while the climber ascends. The team uses a synchronized count to coordinate the release and tensioning of the lines, allowing the climber to reach the damaged section of the sail.0:42 The procedure requires precise communication between the person on the mast and those handling the lines on deck to maintain safety and control during the ascent.
Mais de Allende los Mares · Vuelta Vertical
De Allende los Mares · Vuelta Vertical — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



