Tips from a Shipwrightvideo

Building the TotalBoat - Checking for symmetry (Episode 14)

29 de septiembre de 2016 · 7 min · 238K vistas

¿Qué cubre este video?

Louis Sauzedde and his assistant Andrew are building a wooden skiff, focusing on ensuring the hull remains symmetrical before installing the bottom planking. To verify symmetry, they clamp two pieces of fur across the frame heads and run a center line from the stem to the stern’s outboard aperture. Using a folding rule, they measure the distance from the top of the second plank to the center line at the boat's widest point, confirming an identical 37.5-inch measurement on both the port and starboard sides. To maintain this alignment, they install a diagonal brace from the bottom of a frame on one side to the top of the frame on the

Ver en YouTube

Más de Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEmar 2026Progressive Bevelingfeb 20261958 Harley Davidson Panhead Motorcycle - For Salefeb 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Linesene 2026

De Tips from a Shipwright — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema